Project
Demolition
Client
Vabel
Location
750-756 Harrow Road, London, NW10 5LE
Works duration
8 weeks
Overview
Managing all:
- Disconnection of original services
- Installation of temporary services
- Full strip out of all buildings back to shell
- Full demolition of 3 storey flats
- Full demolition of a 2 storey warehouse
- Full demolition of single storey offices
- Removal of concrete beam structure
- Breaking out of concrete using a Brokk 330 with hammer and crusher
- Breaking out of full site slab with a 12 tonne excavator with hammer attachment
- Removal of steel structural beams with a city crane and cherry picker
- Installation of weather proofing with a cherry picker
- Full structural engineer drawing’s and reports
- Installation of concrete pad stones to fix the steel propping to
- Installation of steel propping to retain the neighbouring boundary walls
- Removal of all strip out waste on Titan wait & loads
- Removal of all brick/block & inert in roll on roll off container
When a job’s too big for just any old London demolition company, you need Titans to do it right.