Project
Strip-Out and Demolition Works
Client
Alexander Maltby LTD
Location
40 Edwardes Square, Kensington, London, W8 6HH
Works duration
12 Weeks
Overview
We are delighted to take on and assist yet another project with Alexander Maltby LTD.
The works included a full strip out of all finishes, furnishings, fixtures and fittings. Walls were removed and openings were created to make space for new doorways. Structural and Temporary works were carried out on this project, along with providing their designs. A reduced dig was carried out and a new drainage system was installed.
As well as most of our projects, we provided our Titan Group wait and load service to remove and recycle all waste on this site.
Works also consisted of:
- Strip-Out
- Demolition
- Temporary Works
- Groundworks
- Builders Works
- Structural Works
- Drainage Works
- Basement Works
- Waste Removal and 100% Recycled