Project
Demolition of 15nr Garages
Client
Matt Finished Ltd
Location
Muswell Hill, London
Works duration
5 weeks
Overview
- Project Management.
- Logistics Management.
- HS&E Management.
- Enabling works.
- 210 Hitachi 360 Excavator.
- R400X Crusher.
- Isolation and Draining of services.
- Scaffolding for property protection.
- Strip out of structures.
- Demolition of Sutton road garage & 15nr garages.
- Removal of 4nr redundant foam filled fuel tanks.
- Demolition of a neighbouring residential 4-bedroom property.
- Removal of non-notifiable and notifiable asbestos.
- Demolition of ground slab and foundations to a depth of 2 metres.
- Reduced dig to an average depth of 1.3 Metres.
- Supply and Install of an 875mm 900sqm piling mat to match the piling specification.
- Crushing of all hardcore and concrete to type 1 spec.
- Saw cutting to retain party wall.
- Supply and installation of temporary props to party wall.
- Removal of all associated waste.
When a job’s too big for just any old London demolition company, you need Titans to do it right.
Accreditations