Project
Strip Out – Beals Shopping Centre.
Client
Commercial Refurbishment Solutions Ltd.
Location
Beales, 30-32 Upper Brook Street, Winchester, SO23 8DG.
Works duration
6 weeks
Overview
- Strip out of toilet areas
- Strip out of kitchens
- Strip out of all Mechanical + Electrical
- Removal of furniture
- Removal of ceilings
- Removal of plasterboard partition walls
- Removal of floor coverings
- Removal of wall & floor tiles
- Removal of air handling equipment
- Removal of all waste on Titan wait&Loads
- Removal of all waste on roll on/roll off skips
- Removal of mechanical plant
- Removal of shop front
- Removal of canteen area
- Removal of windows