Ormonde Road, Sheen

Project

Demolition and Installation of Steels

Client

3 Interiors

Location

Ormonde Road, Sheen

Works duration

4 Weeks

Overview

Project breakdown:

  • Termination of existing services
  • Installation of temporary site power
  • Complete strip out back to shell
  • Demolition of conservatory
  • Strip out of all Mechanical + Electrical
  • Removal of ceilings
  • Clearance and Segregation of all waste, ready to be recycled
  • Removal of wall & floor tiles
  • Removal of floor coverings
  • Removal of ducting
  • Removal of window finishes
  • Removal of raised flooring
  • Removal of all waste on Titan wait & loads
  • Installation of new steel work by Titan