Project
Strip Out
Client
Schwitzke
Location
Tommy Hilfiger, Regent Street, London Bow Street, Covent Garden, London WC2E 9DD
Works duration
8 weeks
Overview
Project breakdown:
- All waste and work compliant with LEED
- Termination of existing services
- Installation of temporary welfare
- Installation of temporary lighting
- Installation of temporary water
- Installation of temporary site power
- Complete strip out back to shell
- Strip out of toilet areas
- Strip out of kitchens
- Strip out of store rooms / racking
- Strip out of all Mechanical + Electrical
- Removal of furniture
- Removal of ceilings
- Removal of plasterboard partition walls
- Removal of floor coverings
- Removal of wall & floor tiles
- Removal of ducting
- Removal of window finishes
- Removal of raised flooring
- Removal of all waste on Titan wait&Loads
- Removal of stairs structure to basement level
- Removal of plant room equipment
- Installation of temporary stairs by Titan
- Installation of scaffold crash decks by Titan
- Installation of new steel work by Titan
- Segregation of all waste in to Titan wheelie bins
When a job’s too big for just any old London demolition company, you need Titans to do it right.