Project
Strip Out & Groundworks
Client
Huntsmere Projects Ltd
Location
Two Chairman Pub, 39 Dartmouth Street, Trafalgar Square, London
Works duration
32 weeks
Overview
- Full strip out of The Two Chairman Pub in Trafalgar Square, London
- Full strip out over 6 floors
- Removal of plaster on walls
- Removal of furniture
- Removal of curling
- Removal of partition walls
- Removal of M + E
- Removal of fixture and fittings
- Reduced dig over the whole basement
- Removal of concrete slab
- Then removed soils 1000mm down
- Removed muck/waste
When a job’s too big for just any old London demolition company, you need Titans to do it right.
Accreditations








